ISO9001 Cable Tray Production Line Mill Integrated Machine For Precision Production
| Features: | Integrated Forming | Power Source: | Electric |
| Voltage: | 220V/380V | Frequency: | 50Hz/60Hz |
| Material: | Metal | Rolling Width: | 100-600mm |
| Usage: | Forming Machine | Rolling Speed: | 10-15m/min |
| High Light: | iso9001 cable tray production line,iso9001 cable tray machine,integrated cable tray machine |
||
Precision production equipment for automated cable tray manufacturing with integrated forming technology.
| Attribute | Value |
|---|---|
| Power Source | Electric |
| Voltage | 220V/380V |
| Features | Integrated Forming |
| Frequency | 50Hz/60Hz |
| Material | Metal |
| Rolling Width | 100-600mm |
| Usage | Forming Machine |
| Rolling Speed | 10-15m/min |
The cable tray rolling and forming machine is essential equipment for modern cable tray production, transforming steel plates into precise cable tray shapes through automated welding technology.
- Automated welding technology reduces human error and ensures consistent quality
- Complete production process from unwinding to forming and receiving
- Performs clamping, punching, and cutting operations automatically
- Advanced control system maintains precise product dimensions
- Significantly improves production efficiency compared to manual methods
| Parameter | Specification |
|---|---|
| Application | Cable Tray Production |
| Power | 5.5kW |
| Rolling Thickness | 0.8-1.5mm |
| Product Name | Rolling Plate Cable Tray Synthesis Machine |
This versatile machine produces high-quality cable trays for various industrial and commercial applications including:
- Telecommunications infrastructure
- Electrical engineering projects
- Construction installations
- Industrial cable management systems
The machine is securely packed in wooden cases for protection during transportation. We offer flexible shipping options via sea or air freight through reliable carriers to meet your delivery schedule.
Manufactured in Hebei, China.
Yes, ISO9001 certified.
Negotiable based on requirements.
15-30 working days after order confirmation.